The installation of the transverse milling and digging machine head needs to pay attention to the following points:
1. Preparation: Before installing the head of the domestic lateral milling and digging machine, it is necessary to check whether the machine meets the requirements, and clean the machine to remove the fine metal chips and other debris. At the same time, prepare the required special tools and installation accessories.
2. Installation positioning: Position the head on the machine tool, and install it on the machine tool with bolts. Make sure the head position is correct and tighten the bolts to ensure the stability of the head.
3. Check the electrical line: check the electrical line of the machine head to ensure that the line plug and socket are firmly connected, and there is no short circuit and leakage.
4. Adjust the Angle: Adjust the Angle of the head as required. When installing the nose, be sure to follow the instructions provided by the manufacturer to ensure that the nose Angle is correct and that it is able to perform the required task.
5. Test run: After completing the above steps, test run is carried out to check whether the head works normally and whether each component works well.
In summary, the installation of the lateral milling and dredging machine head or rock lateral milling and dredging machine requires careful operation in accordance with the manufacturer's guidelines to ensure the correct Angle and position of the head, and a test run to ensure that the head is in good working condition. Timely treatment of problems, strengthen maintenance and maintenance, can ensure the lasting stability of the head, for production and processing to bring better results.